Control & AutomationIn progress
LPG terminal: loading automation and SCADA
- Problem
- Truck loading ran on paper tickets and phone calls, with no reliable link between the meter and the record.
- What we did
- Redundant PLC, SCADA, four loading bays with preset meters, two weighbridges, tank gauging, fire and ESD pages, and a full document set.
- Result
- All four bays loading end to end from the bay keypad; system at site acceptance stage.